Lake Bluff Multi-Family Development

Greeley, Colorado

Swing sets clanging against the playground poles, bicycle tires whirring against the Northern Colorado air, and families laughing over a playfully patterned picnic blanket in the park. When our team designs multifamily developments like Lake Bluff, we keep the vibrancy of a harmonious community at the forefront of our vision. This project encapsulates Tract G of the Lake Bluff subdivision, offering a pickleball court, dog parks, playgrounds, pool, bike racks, and open outdoor space. The multifamily plan, adjacent to 7th Street and 101st Avenue, boasts 288 units with convenient on-site parking. Our team ensured off-site stormwater could be captured and conveyed to and through the site. Our storm and drainage design had to comply with the Lake Bluff Subdivision Phase 1 Master Drainage Study.

Stormwater Infrastructure & Design

  • Entitlement through City of Greeley and CDOT
  • Pre-planning Design
  • Regional Stormwater Design for 300-acre subdivison
  • Regional Non-Potable irrigation design
  • Storm sewer infrastructure

Hydrology and/or Hydraulic Studies

  • Prepared Hydrology and Hydraulic analysis and report for 300-acre development that the Lake Bluff Multifamily Development was a part of.

Field Reconnaissance

  • Easement Acquisition
  • Subdivision Platting
  • Boundary and topographic survey of Tract G
  • Right of Way Acquisition