Bellevue, Nebraska
In 2015, Offutt Air Force Base reconstructed the southern portion of SAC Boulevard from the South Gate to the Stratcom building. Since then, Offutt has relocated Stratcom and effectively changed the traffic patterns in this base area. As a result, updates need to continue along one of the most prominent roadways on the base.
With SAC Boulevard’s increased use and a need for improvements, Lamp Rynearson transportation engineers designed the reconstruction of SAC Boulevard in several sections totalling approcimately 2,900 LF. Improvements to each section include relocation of utilities and new storm sewers. New sidewalks have also been developed as part of the project. Our team worked with Air Force personnel to provide an essential design document for funding approval of these roadway improvements.
The roadway reconstruction of SAC Boulevard will be executed in a well-planned, phased approach. This approach will ensure the use of alternate routes and maintain access for traffic and emergency response teams at all times. This strategy is designed to minimize disruption and ensure the smooth progress of the project.